Home 01About 02Services 03Lanes 04Technology 05News 06Contact 07 切换为中文
0755-85279597 service@jiyunlog.com 广东省深圳市宝安区福永智荟园 A1 栋
Container ship at sea
Home/Lanes

Core dedicated lines

Covering 200+ countries and regions. The table below shows scheduled lanes with their transit terms; destinations not listed are quoted on request.

Europe · COD heartland

High cash-on-delivery acceptance makes Europe the biggest growth area for cross-border parcels. 3-5 days to major cities, 6-8 nationwide, Poland line 7-12 days duty-inclusive.

7 lanesCODDuty-inclusive

Asia · Speed and density

Next-day to Hong Kong, China and Macao, China; COD parcels across six Southeast Asian markets. Short hops and dense flights build buyer-side reputation.

9 lanesNext-dayDropshipping

N. America · Certainty only

US consolidation with fixed flights and transparent billing. Not the cheapest — simply arriving when we say it will.

ConsolidationFixed capacityClear billing
LANE LIST

Filter by region

Filter by region. The highlighted value marks the most competitive transit time in that region.

Europe-wide (COD)
3-5 / 6-8 days
Poland
7-12 days
Spain
COD parcel
Portugal
COD parcel
Romania
COD parcel
Czechia
COD parcel
Hungary
COD parcel
Hong Kong, China
Next-day
Macao, China
Next-day
Taiwan, China
Dedicated line
Thailand
COD parcel
Vietnam
COD parcel
Singapore
COD parcel
Philippines
COD parcel
Malaysia
COD parcel
Indonesia
COD parcel
US Consolidation
Consolidated
Transit times are references for normal operations and fluctuate with flights, customs, peak seasons and holidays. Destinations not listed can still be quoted — we cover 200+ countries and regions, subject to channel confirmation.
HOW TO READ

How to read this table

The same “7 days” can mean very different things. Aligning terms is the foundation of a lasting partnership.

When does the transit time start?

From the day the cargo is actually picked up and booked — not the day you instruct us. Domestic consolidation time is not counted.

Are “days” working days or calendar days?

Unless marked otherwise, all figures are calendar days including weekends. Public holidays at the destination usually extend delivery.

Why can one country have two figures?

Europe is split into major cities (3-5 days) and remote areas (6-8 days). We confirm which tier your address falls into before booking.

Do duty-inclusive transit times include customs?

Yes — they cover export declaration and import clearance. Inspection delays are excluded from the committed time, and we keep you posted proactively.

Destination not listed? Just ask